Continental Carparks Hilversum
A parking garage can be both functionally and aesthetically enhanced using technical textiles, as illustrated by the project at Tergooi MC in Hilversum. This project focused on improving the safety of the ramps and creating a design that blends with the forested environment.
Continental Car Parks had a specific request for an already completed parking garage at Tergooi MC in Hilversum. Located in a unique setting, surrounded by forest and at the front of the new hospital, the garage needed enhancements to the safety and aesthetics of its ramps. The facility manager wanted to fill the 200 mm wide gaps between the railing bars with an appropriate material to enhance ramp visibility and traffic safety. The request was received in late April, with a completion deadline at the end of June.
With a tight deadline in mind, our team acted quickly and efficiently to meet this requirement. We designed a solution where 38 railings along the interior of both ramps were covered with a specialized mesh fabric. This fabric not only serves as a visual barrier but also acts as a protective layer, effectively filling the gaps between the bars to enhance safety. The choice of this technical textile focused on durability, aesthetic integration with the garage's surroundings, and ease of maintenance.
This project highlights our ability to respond swiftly to client needs and deliver high-quality solutions within a short timeframe. It demonstrates that our project management expertise and efficiency are essential for completing urgent projects successfully and strengthens our reputation as a reliable provider of technical textile solutions.
Full in-house capabilities from start to finish
Our designer creates an initial sketch and provides an artistic rendering to deliver a clear visual solution for a realistic image. We also provide a cost estimate.
If you're pleased with the sketch and budget, we'll move on to the preliminary design phase, complete with final calculations, including design specifications, costs, and structural requirements.
Before we proceed with production, we finalize the construction details in a binding timetable.
Our next step is to execute the production and installation plan. Materials will be packed and delivered to the site, where our VCA-certified technicians will manage the installation.
Once the installation is complete, a handover with the project leader will take place, during which everything will be thoroughly checked. We also provide maintenance and service, customized to the project and in agreement with the client.
A team of experts
From sketch to realization. Our experts handle everything with detailed precision.